000 01143cam a2200301 i 4500
999 _c865
_d865
001 3258066
003 Biblioteca de INTEMIN
005 20180428205912.0
008 801119s1981 dcua b 000 0 eng
010 _a 80607856
040 _aDLC
_cDLC
_dDLC
050 0 0 _aTN23
_b.U43 no. 8554
_aTN780
082 0 0 _a622 s
_a669/.3
_219
086 0 _aI 28.23: 8554
100 1 _aAnable, W. E.
_92791
245 1 0 _aCopper recovery from primary smelter dusts /
_cby W.E. Anable, J.I. Paige, and D.L. Paulson.
260 _a[Washington, D.C.] :
_bU.S. Dept. of the Interior, Bureau of Mines,
_c1981.
300 _a19 p. :
_bill. ;
_c27 cm.
490 1 _aReport of investigations - United States, Bureau of Mines ;
_v8554
504 _aBibliography: p. 19.
650 0 _aCopper
_xMetallurgy.
_91082
650 0 _aSmelting furnaces.
_91429
650 0 _aDust.
_92792
700 1 _aPaige, J. I.
_q(Jack I.)
_ejoint author.
_92793
700 1 _aPaulson, D. L.
_q(Danton L.),
_ejoint author.
_92794
830 0 _aReport of investigations (United States. Bureau of Mines) ;
_v8554.
_9793
906 _a7
_bcbc
_corignew
_du
_encip
_f19
_gy-gencatlg
942 _2udc
_cCR